TAG Oil Blog

Cheal-C site testing photos

Posted by Denise della Santina on Nov 26, 2011 7:10:00 AM

New photos of the Cheal-C site are just in from the field. The wellhead in the center with the protection around it is the Cardiff-2A-ST1, which discovered deep liquid-rich gas.

Blog C Site

Mini-Cheal set up for testing. This is it, starting from right: rented silver heater unit (runs on C2 gas), rental pump (blue), rental conditioning unit (green), and TAG’s silver heated storage tank.
Cheal-C1 and Cheal-C2 wells
The Cheal-C1 and Cheal-C2 wells: The red high pressure hose gets gas from C2 to heat our power fluid, and pipes bring the heated power fluid in—and oil out—on the C1 wellhead.
Jack Doyle, TAG Oil
Jack Doyle, TAG's head of engineering directs the team from Horizon.
Tank dipA tank dip is the only way to measure production for now.

Topics: Cardiff, Cheal-C site, Jack Doyle