New photos of the Cheal-C site are just in from the field. The wellhead in the center with the protection around it is the Cardiff-2A-ST1, which discovered deep liquid-rich gas.
![]() Mini-Cheal set up for testing. This is it, starting from right: rented silver heater unit (runs on C2 gas), rental pump (blue), rental conditioning unit (green), and TAG’s silver heated storage tank. |
![]() The Cheal-C1 and Cheal-C2 wells: The red high pressure hose gets gas from C2 to heat our power fluid, and pipes bring the heated power fluid in—and oil out—on the C1 wellhead. |
![]() Jack Doyle, TAG's head of engineering directs the team from Horizon. |
![]() |