Some pictures from the prep work for Phase 3 North Island Taranaki Basin ops, covering Cheal, Cardiff and Sidewinder.
![]() Temporary pipe work at Cheal-BH-1—already our best well at Cheal—waiting on 225m of perfs. |
![]() The old Cardiff 2A wellhead. Doesn’t look like much but there's gas down there. |
![]() InterDrill rig at Sidewinder, ready to drill 3 more 25m conductor holes: Sidewinder-2, 3, and possibly 4 |