TAG Oil Blog

Cheal-E6 well perforated and production testing starts

Posted by Denise della Santina on Dec 9, 2014 1:28:00 PM

Here are some shots of our capable contractors dropping the bar to perforate the Cheal-E-JV-6 well, as we initiated production testing.

The Cheal-E6 step-out well was successfully drilled to 1,939 meters (6,360 feet), and it fulfilled its main objective: to intersect oil- and gas-bearing sands in the Mt. Messenger Formation. It’s interpreted to have intersected more than nine meters (29.5 feet) of net oil- and gas-bearing sands, and the well is being completed as a potential oil well with production testing underway.

Results will be known after we have a few weeks of production testing under our belts. Now it’s on to TAG’s Cheal-E7 well!

IMG 1824describe the image

Topics: Cheal oil and gas site, Cheal Oil Field